Isle of Hope K-8.
This 120,000+ sf project is a new two-story self-contained building which was constructed in place of the existing school with breezeways. Construction consisted of masonry block with brick exterior. The school has 40 classrooms, 4 science classrooms, a media center, computer lab, music and art rooms, along with a gymnasium, kitchen and dining area. The building is designed to house 800 grade K-8 students.
$20.3 million
Role: Construction Manager at Risk